July 16
For every project, it’s all about division of labor. After quick
breakfast, we continue go into the forest and start our work. Since the
materials were limited, we only have the nylon strings for the grid placing. It
took a complicated procedure for us to fix the strings in a straight way. Just
we use the stands and stones to fix them.
After the grid placing, we start to survey the location and the abundance of
plants in the area. And here is our draft work, different logo represents
different types of the plants. The location is also noted in the paper with
calculated scale. We completed this progress before lunch.
That’s means we finished the site work before lunch !!!
After the field work, here is our paper work…
It’s very strange there were no fine table in the dorm room…
So, we do our work on the bed…………
Finally, finished =]!!!
No comments:
Post a Comment