Sunday, July 28, 2013

Second day of the project

July 16
For every project, it’s all about division of labor. After quick breakfast, we continue go into the forest and start our work. Since the materials were limited, we only have the nylon strings for the grid placing. It took a complicated procedure for us to fix the strings in a straight way. Just we use the stands and stones to fix them.

After the grid placing, we start to survey the location and the abundance of plants in the area. And here is our draft work, different logo represents different types of the plants. The location is also noted in the paper with calculated scale. We completed this progress before lunch.

That’s means we finished the site work before lunch !!!

After the field work, here is our paper work…
It’s very strange there were no fine table in the dorm room…

So, we do our work on the bed…………

Finally, finished =]!!!

No comments:

Post a Comment